A Solution is Needed Now

Humanity is drowning in the volume and weight of its own waste. You already know landfills are filling. The developing world is refusing to accept exported garbage and recycling only goes so far.

About Us

The On-Site Waste Processing Revolution Reaches Australia

International Garbage Solutions Australia (IGS Aus) is a family owned and operated business established in 2020 based in Maroochydore, Queensland. We also have a sister company servicing the Middle East based in Dubai, U.A.E. IGS Aus are the leading Australian distributors of various sized state-of-the-art environmental waste processing systems (WPS). The WPS can be used as a revolutionary on-site solution to turn garbage into a dry, sterile, odorless material. This reduces waste volumes and associated waste costs by up to 80% with the possibility for 100% diversion from landfill. The resultant material can be used by different industries in a variety of ways, with potential use of the processed waste for saleable fuel or feedstock. The WPS can be classified as Zero Emissions Equipment (ZEE) due to its advanced effluent treatment system and low processing temperatures. No dust or harmful emissions of any kind are released into the environment and water is the only by product, which can be further purified as needed. During a trial period at the Hospital of Massa, Italy, The Second University of Naples carried out some testing on the WPS and found “Not a single spore or pathogen had survived in any one of the 5 monitored treatment cycles”. We have a demonstration unit right here on the Sunshine Coast which is the only one of its kind in Australia. We offer interested parties the opportunity to view a live demonstration at our facility.

IGS is currently dealing with companies in the following industries

Mining

Remote Islands and Communities

Medical Industry

Sports Stadiums

Military

Government

Oil & Gas

Airports

Current Users Of WPS Around The World Include:

Waste Processing System (WPS)

THE INNOVATIVE ALTERNATIVE TO LANDFILL DUMPING

Built to the highest industry standards using only first-class European materials and craftsmanship, the WPS is changing the way businesses think about and process waste. Current forward-thinking leaders in a variety of industries including mining, oil & gas, the military, hospitals, remote islands & communities, vessels, airports and more… are now able to reduce waste volumes by up to 80% and weight by up to 70% on-site thanks to the WPS. It’s been hailed a game-changer because of its cost saving potential, possibility of 100% diversion from landfill, and potential use of the processed material as a saleable fuel. Read on to see how this solution can suit your operations.

What can be Processed:
The WPS are designed to process a variety of materials including:

  • Organic/food waste
  • Mixed waste (Household garbage)
  • Medical/hazardous waste
  • Cardboard/paper
  • Hard and soft plastics 
  • Glass
  • Tin and aluminum cans

The 6 phase fully automated process Read More…

WPS Units come in 5 sizes ranging from the WPS 200 to the WPS 5000. Read More…

Waste Processing System (WPS)

THE INNOVATIVE ALTERNATIVE TO LANDFILL DUMPING

Built to the highest industry standards using only first-class European materials and craftsmanship, the WPS is changing the way businesses think about and process waste. Current forward-thinking leaders in a variety of industries including mining, oil & gas, the military, hospitals, remote islands & communities, vessels, airports and more… are now able to reduce waste volumes by up to 80% and weight by up to 70% on-site thanks to the WPS. It’s been hailed a game-changer because of its cost saving potential, possibility of 100% diversion from landfill, and potential use of the processed material as a saleable fuel. Read on to see how this solution can suit your operations.

Processing Recyclables

Processing General Household Garbage.

Uses of By Product

PRODUCTION RANGE

Typical throughput with different waste categories

What is The WPS?

WPS Units come in 5 sizes ranging from the WPS 200 to the WPS 5000.
Here they are:

The WPS 200/500 can be housed in a 20ft shipping container is easily transported and used on/offshore in the oil, gas and mining industries, onboard vessels, in military camps and remote locations. Processes all types of waste. Typical throughput = up to 90kg/hr depending on the waste type.

The WPS 1000 as seen here installed in a hospital in Europe. Turning medical waste into sterile, stable material (RDF) destroying any bacteria or pathogens at a rate of up to 120kg/hr running for 20hrs per day

The WPS 2000 ideal for any industry where up to 1000kg/hr of waste needs to be processed. Suits all waste streams including mixed solid waste, organic/food waste, medical/clinical waste, recyclables, aluminium, plastic, and glass.

The WPS 5000 is the largest in the range with a 5250 litre processing chamber. Up to 2000kg/hour of waste can be processed. The waste bin seen here is lifted by a fully automated system. Industries with high waste volumes such as airports, government facilities, shopping malls, hotels and hospitals benefit from this unit.

WPS In Australia: 6 Steps To Reducing Your Company’s Waste Volume By Up To 80%

Working with International Garbage Solutions Australia to reduce your waste volume, save money and reduce your environmental impact is a simple and transparent process:

Step 1

Discovery: Book your “Waste Savings Discovery Consultation” (see details below) where we look at your current waste numbers and what you want to achieve and prescribe the most efficient and cost effective solution.

Step 2

Live Demonstration: If, after your Discovery Consultation, we believe we can help you achieve the outcomes you want, you will be invited to a live demonstration at our Sunshine Coast (Qld) headquarters.

Step 3

Custom Solution Created: Based on your needs a proposal is created and presented to you for approval; includes budgetary pricing.

Step 4

Confirmation: Follow up meeting where final details are verified and Letter of Intent is completed.

Step 5

Authority to Proceed: Initial deposit is paid. Your paperwork is submitted to the manufacturer and production begins.

Step 6

Installation, Testing, Commissioning of your IGS Machine: On arrival, your WPS is delivered to your site and thoroughly tested before handover.

From this problem...

...to this solution

...in as little as 30 minutes!

A SIMPLE SOLUTION TO A GLOBAL EPIDEMIC

What to Do Next

To find out if the Waste Processing System by IGS Aus is right for your business, take the first step and book a no cost, no obligation waste saving discovery consultation today OR call Dave on +61407445766

When you book your time you will be sent confirmation details via email.
IMPORTANT: 48 hours PRIOR to your scheduled call please provide IGS with the following: